we kindly ask you to direct the grant aid for equipping multi-profile University Hospital in the village of Rukhi, Zugdidi, which is under the state ownership. The entire construction area covers 30,000 square meters. 220-bed university hospital consists
of 7 blocks and different type of technical buildings. At the moment, the construction is completed in all 7 buildings, where will be available ultrasound, X-ray and wide range of laboratory and instrumental examination and full-service of radiation therapy.
Sewage, water supply systems, outer perimeter paving and helicopter landing area is arranged. Classrooms and libraries for medical students and residents, sports facilities, parking, internal paths, on the territory of the hospital are also arranged. Besides,
92-bed dormitory for the residents and the family members of patients is considered. The internal decorating works will be completed till the end of the year.
ანა,
გთხოვ, გადახედე, რამე ფაქტობრივი უზუსტობა ხომ არ არის? მადლობა წინასწარ.
we kindly ask you to direct the grant aid for equipping multi-profile University Hospital in the village of Rukhi, Zugdidi, which is under the state ownership. The entire construction area covers 30,000 square meters. 220-bed university hospital consists of 7 blocks and different type of technical buildings. At the moment, the construction is completed in all 7 buildings, where will be available ultrasound, X-ray and wide range of laboratory and instrumental examination and full-service of radiation therapy. Sewage, water supply systems, outer perimeter paving and helicopter landing area is arranged. Classrooms and libraries for medical students and residents, sports facilities, parking, internal paths, pools and parks on the territory of the hospital are also arranged. Besides, 92-bed dormitory for the residents and the family members of patients is considered. The internal decorating works will be completed till the end of the year.
From: Ana Gogberashvili
Sent: Monday, July 23, 2018 11:19 AM
To: Maia Nikoleishvili
Subject:
დარჩენილი სამუშაოები საორიენტაციოდ არის : ლიფტების სამონტაჟო სამუშაოები,ელექტრო სამონტაჟო სამუშაოები ( როზეტები, ჩამრთველები,სანათები და სხვ) სანტექნიკა და ფურნიტურა, ძირითადი სამღებრო სამუშაოები, შიდა მოპირკეთება (იატაკები, ჭერები) ლითონკონსტრუქციების ღებვა და ხანძარუსაფრთხოება.